Assembly/AU/Dec.565(XXIV)
Page 2
iii)
8.
the Commission to finalize all necessary consultations on the First Ten Year
Implementation Plan of Agenda 2063 with a view to submitting it at the
June 2015 meetings of the AU Policy Organs.
TAKES NOTE of the commendable progress made in the formulation and
development of the following Agenda 2063 Flagship projects and promoting
reconciliation in Africa:
i)
ii)
iii)
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
xii)
9.
10.
Integrated High Speed Train Network;
Great Inga Dam;
Single African Aviation Market;
Outer Space;
The Pan African E-Network;
Creation of an Annual African Consultative Platform;
Establishment of the Virtual University;
Free Movement of Persons and the African Passport;
The Continental Free Trade Area;
Silencing the Guns by 2020;
Development of a Commodity Strategy;
Establishment of the Continental financial Institutions, including the African
Central Bank by 2030.
REQUESTS the Commission to:
i)
present detailed road maps for the implementation of each of the flagship
projects for consideration by the AU Policy Organs in June 2015;
ii)
ensure that the issues and concerns of African Island and Landlocked
States are adequately mainstreamed into all continental frameworks for
political, social, cultural and economic development, including the addition
of a representative of Island States to the Bahr Dar Ministerial Follow-up
Committee;
iii)
facilitate access to funds required by Island States, including under the
Agenda 2063 Resource Mobilization Strategy, as well as Climate funds by
2020.
AUTHORISES the convening of a Ministerial Retreat as proposed by the
Commission and the Ministerial Follow-Up Committee in between the two
summits to brainstorm on the draft 1st 10 year Implementation Plan of Agenda
2063 as well as other relevant issues including all flagship projects, and those
pertaining to agricultural transformation and eradication of poverty, so as to
report at the next Summit in June 2015. In the same vein REQUESTS the
Commission to pursue consultations with the RECs and other stakeholders so
as to gather all contributions from all concerned partners in this process;